HELLCAT PROJECT

80% PANTERA / 20% BANGEMALL METALS

HELLCAT LEAD-SILVER PROJECT

  • Greenfield project within 70km’s of Galena Mining’s (ASX:G1A) Abra Lead-Silver Mine (34.5Mt @ 7.2% Pb and 16 g/t Ag)
  • 4 diamond holes completed for 1833m with extensive hydrothermal alteration and low level Pb-Ag detected in all drill holes
  • Regional reconnaissance sampling completed with rock chip grades to 1.9% Pb, 0.5% Zn and 97 g/t Ag

Project Footprint

  • 850km NNW of Perth, 230km NW of Meekatharra and 220km SW of Newman
  • 80% interest in 4 granted tenements (E52/3881, E52/3896, E52/3944 and E52/4026) covering 442 km2 of the same stratigraphy that hosts Abra
  • 20% retained by the Vendors – Bangemall Metals Pty Ltd – a renowned group of geologists and geophysists with extensive knowledge of base metal mineralisation within the Edmund Basin

Next Steps

  • Close spaced ground gravity survey over the Teano and Postcutters Pb-Ag targets on E52/3881 to better define drill targets
  • Close spaced airborne VTEM surveying over Pb-Ag and Zn targets on E52/3896, E52/3944 and E52/4026 to define new drill targets

PROJECTS IN WA’S MINERAL HEARTLAND

HELLCAT

 

Lead-silver project in
WA’s Edmund Basin

YAMPI

Hematite Iron Ore
Porphyry Cu target

WEELARRANA

High Grade Manganese targets and Iron Ore to Channel Iron targets

SUBSCRIBE TO RECEIVE CORPORATE UPDATES