HELLCAT PROJECT
80% PANTERA / 20% BANGEMALL METALS
HELLCAT LEAD-SILVER PROJECT
- Greenfield project within 70km’s of Galena Mining’s (ASX:G1A) Abra Lead-Silver Mine (34.5Mt @ 7.2% Pb and 16 g/t Ag)
- 4 diamond holes completed for 1833m with extensive hydrothermal alteration and low level Pb-Ag detected in all drill holes
- Regional reconnaissance sampling completed with rock chip grades to 1.9% Pb, 0.5% Zn and 97 g/t Ag
Project Footprint
- 850km NNW of Perth, 230km NW of Meekatharra and 220km SW of Newman
- 80% interest in 4 granted tenements (E52/3881, E52/3896, E52/3944 and E52/4026) covering 442 km2 of the same stratigraphy that hosts Abra
- 20% retained by the Vendors – Bangemall Metals Pty Ltd – a renowned group of geologists and geophysists with extensive knowledge of base metal mineralisation within the Edmund Basin
Next Steps
- Close spaced ground gravity survey over the Teano and Postcutters Pb-Ag targets on E52/3881 to better define drill targets
- Close spaced airborne VTEM surveying over Pb-Ag and Zn targets on E52/3896, E52/3944 and E52/4026 to define new drill targets
PROJECTS IN WA’S MINERAL HEARTLAND
HELLCAT
Lead-silver project in
WA’s Edmund Basin
YAMPI
Hematite Iron Ore
Porphyry Cu target
WEELARRANA
High Grade Manganese targets and Iron Ore to Channel Iron targets