WEELARRANA PROJECT

Weelarrana Iron and Manganese Project

  • Greenfield project location 75km south of Newman and within the same stratigraphy as E25’s (ASX:E25) Butcherbird Manganese Mine and Firebird Metals (ASX:FRB) 616 Manganese Project
  • Two phases of RC drilling conducted over manganese targets with 120 holes for 3150m completed. Best results include 5m @ 12.3% Mn, 3m @ 19.7% Mn and 2m @ 14.9% Mn
  • Widespread Channel Iron Mineralisation encountered with rock chip grades to 62.6% Fe and RC drilling of 2m @ 53.6% Fe

Project Footprint

  • 75km south of Newman with access via the Great Northern Highway and the Jiggalong and Weelarrana North Roads
  • 100% interest in 5 granted tenements (E52/3878, E52/3981, E52/4046, E52/4071 and E52/4072) and 2 tenement applications (E52/3892 and E52/4173) covering 958 km2
  • Year-round exploration is possible

Next Steps

  • PoW’s approved for RC drill programs over the Channel Iron mineralisation and further outcropping high grade manganese mineralisation
  • Heritage surveys over proposed drill program areas
  • RC drilling once Heritage surveys are completed

PROJECTS IN WA’S MINERAL HEARTLAND

HELLCAT

 

Lead-silver project in
WA’s Edmund Basin

YAMPI

Hematite Iron Ore
Porphyry Cu target

WEELARRANA

High Grade Manganese targets and Iron Ore to Channel Iron targets

SUBSCRIBE TO RECEIVE CORPORATE UPDATES